Day Two and Three

Day two: New plywood replaces old on the countertops; and the farmhouse sink is in place.


Day three: More drywall is in place, the holes are drilled for the faucet and sprayer


The old knob and tube wiring is replaced and all sockets are being grounded


Old light fixtures are removed and six recessed lights are being installed around the ceiling


Wires hanging down where a recessed light is being installed.
This countertop along the west wall of the kitchen is also prepped and ready for tiling.

Next
Previous page
Home