Work begins on the replacement of docks H, I, and A through E. These docks are nearly 40 years old, and will be reconfigured and replaced with the help of a low-interest loan from the California Dept. of Boating and Waterways. Measuring the depth of mud and clay in the bottom of the Marina is the first step. previous photo - - - - - - - - - - - - next photo |